Chilled Water Piping & ETS Works
AIC ensured flawless testing and commissioning of all installed systems.
Categories:
Date Posted:
June 22, 2025
Share This:
Project Overview
Project: Chilled Water Piping & ETS Works
Client: Tabreed
Location: Bahrain
Duration: 2019
Project Description
Arabian International Contracting Co. WLL (AIC) successfully executed the Chilled Water Piping & Energy Transfer Station (ETS) works for Tabreed in 2019. This project was a critical part of enhancing cooling infrastructure through precise electrical and instrumentation installations.
Our scope involved the installation of an Allen Bradley PLC Panel (1 No.), complete instrumentation and cabling works, and seamless SCADA integration with the existing control panel. These components were crucial for ensuring accurate control, monitoring, and efficiency of the chilled water system.
Excellence in Execution
AIC ensured flawless testing and commissioning of all installed systems, resulting in optimal performance and reliability. This project reflects our capability in delivering intelligent automation solutions that support energy efficiency and operational excellence in district cooling infrastructure.