
STP Expansion Phase 4 Waster Water & Incineration Project
AIC plays a pivotal role in tasks like site assembly, installing furnaces, air systems, boilers, and constructing silos.
Categories:
Date Posted:
May 25, 2025
Share This:
Project Overview
Project: STP Expansion Phase 4 – Waste Water & Incineration Project
Client: WTE Wassertechnik GmbH, Germany
Project Description
As part of the STP Expansion Phase 4 Waste Water & Incineration Project for WTE Wassertechnik GmbH, Germany, AIC undertook a critical role in delivering comprehensive assembly, installation, and fabrication works. This complex project required precision and coordination across multiple technical areas to support the expansion and modernization of the wastewater treatment and incineration systems.
AIC was responsible for the site assembly and installation of major components such as furnaces, boilers, air systems, and steel structures. In addition, our scope extended to the manufacturing and delivery of essential components like silos, steel platforms, ducting, and flue gas stacks. With a focus on quality, safety, and timely execution, AIC successfully contributed to enhancing the operational infrastructure of the facility, aligning with international standards and client expectations.
Scope of Work
Site Assembly & Installation Works
-
Fluidized Bed Furnace (FBF), 2 Units
-
Air Ducts including Pipe/Duct Supports
-
Air Fans, 6 Units
-
Air Preheater
-
Waste Heat Boilers (WHB) including platforms, 2 Units
-
Waste Heat Boilers Piping
-
Flue Gas Treatment System
-
Silo Group (Steel Structure, Silos & Equipment)
-
Turbine & Generator Set
-
Building Steel Structures (Building 86 & 87)
-
Steel Platforms in Building 87 (including Handrails and Gratings)
-
Water–Steam Cycle (Tanks)
-
Auxiliary Equipment Installation
Manufacturing and Delivery to Site
-
Silo Steel Structure, Silos, Building Steel Structures, Gratings & Handrails
-
Air Ducting (Incineration Air Supply)
-
Stacks for Flue Gas Treatment
-
Stack for Auxiliary Boiler
Project Highlights
-
Execution of both on-site and off-site fabrication and installation
-
Integration of advanced incineration and steam cycle systems
-
Delivery of critical equipment with high manufacturing precision
-
Contribution to enhanced environmental infrastructure and waste management



