Complete Relining Works for Pot Line 6

AIC successfully executed a comprehensive refractory relining project for Pot Line 6 at ALBA.

Categories:

Date Posted:

June 22, 2025

Share This:

Project Overview

Project: Complete Relining Works for Pot Line 6
Client: ALBA
Location: Bahrain

Scope of Work

  • Cutout Pot Replacement Works

  • Removal of Damaged Refractory Material from Pot Shells

  • Repair & Refurbishment of Pot Shells

  • Refractory Relining and Ramming

Project Description

AIC successfully executed a comprehensive refractory relining project for Pot Line 6 at ALBA, reinforcing our expertise in precision-driven industrial maintenance and refurbishment. The project began with the removal and replacement of pot cutouts, followed by the careful excavation of damaged refractory material from the pot shells. This process demanded high levels of precision to protect the integrity of the underlying structure.

Once cleared, the pot shells were meticulously repaired and refurbished, ensuring optimal conditions for receiving the new refractory lining. The final stage involved accurate refractory relining and ramming, a critical step to restore operational efficiency and thermal performance.

Excellence in Execution

This project highlights AIC’s ability to deliver high-quality, technically intensive solutions within the heavy industrial sector. Through strict adherence to safety, quality control, and engineering standards, the relining of Pot Line 6 was completed on time and with exceptional results. AIC’s successful execution of this project further demonstrates our position as a trusted partner for specialized industrial contracting and maintenance works.

Get the latest news & updates

recent posts