Major Internal Maintenance of ESR – West Riffa 1 Blending Station

This project demonstrated AIC’s capability to undertake specialized maintenance works for critical utilities infrastructure.

Categories:

Date Posted:

June 22, 2025

Share This:

Project Overview

Project: Major Internal Maintenance of ESR – West Riffa 1 Blending Station
Client: Electricity and Water Authority (EWA)
Location: Bahrain
Duration: June 2014 – September 2014

Scope of Work

  • Internal Painting of Water Tank

  • Corrosion Protection for:

    • Water Tank

    • Surge Vessel

    • Surge Tower

    • Other Steel Structures

Project Description

AIC successfully executed the major internal maintenance of the Emergency Storage Reservoir (ESR) at West Riffa 1 Blending Station, under the directive of the Electricity and Water Authority (EWA). The project, carried out over a three-month period, aimed to enhance the longevity and performance of essential water infrastructure components.

Key activities included internal tank painting and corrosion protection treatments for the water tank, surge vessel, surge tower, and associated steel structures. These measures were vital to safeguarding the integrity of the systems against corrosion and environmental wear, ensuring continued reliability and operational efficiency.

Excellence in Execution

This project demonstrated AIC’s capability to undertake specialized maintenance works for critical utilities infrastructure. By applying protective coatings and executing high-standard surface treatment procedures, AIC delivered a solution that significantly prolongs equipment lifespan and reduces maintenance downtime—reinforcing our reputation as a trusted partner in utility sector maintenance and infrastructure care.